M/s Paulose George Construction Company (P) Ltd. Is in the business of executing Civil Engineering Contracts. The company is an offshoot of the erstwhile partnership firm M/s. Paulose George Construction Company who where Civil Engineering Contractors for more than 9 years.

SL.No. Name & Type of Project Brief Technical Description Full postal address of Client / Officer in charge Value of Contract (in Rupees)
1 DRIP: Rehabilitation and Improvement of Basic Facilities of Kuttiyadi Irrigation Project (Civil works)- Grouting , rectification of stilling basin of masonry dam,reformation of Saddle Dam, construction of protection wall  Superintending Engineer, Irrigation Department Project Circle, Civil station,  Kannur-2 21,48,69,059
2 Pambar Basin Projects-Reconstruction of Pattisserry Dam & canal system under Chengalar Scheme and appurtenantworks  Construction of concrete Dam & earthen Dam Road over the Dam , approach road, Utility building The Superintending Engineer ,
Office of th e SE ,Project Circle , Muvattupuzha
 20,39,70,086
 3 Rehabilitation and improvement of Basic Facilities of Kanhirapuzha Irrigation Project Strengthening of Masonry Dam ,Reaming exiting drainage holes from dam top , Construction of compound wall , reconstruction of  drains The Superintending Engineer
Siruvani Project Circle, Chunnambuthara, Vadakkanthara(PO) Palakkad, Kerala
14,23,94,020
4 Miscellaneous Civil &Structural Works for PDPP Of M/s BPCL-KOCHI REFINERY, KOCHI,  Supplying, fabrication, welding, painting and erection of structural steel works and civil works for Pipe Racks , BPCL-Kochi Refinery Post Bag No : 2 Ambalamugal 29,88,83,847
5 Civil/Structural Works  For Offsite For BS-VI MS Block Project Of M/s BPCL-Kochi Refinery, Kochi, Kerala.  “RCC and Structural Steel workspavements,Construction of Hard stands., (OWS)/SWS, Contaminated Rainwater Sewer (CRWS), Laying of Drinking water line and its connection with existing line,Supply, laying and installation of buried earth strip, earth plates, earth” BPCL-Kochi Refinery Post Bag No : 2 Ambalamugal 45,01,85,127
6 NABARD RIDF-XXI- Construction of Salt water Exclusion Regulator cum Bridge across Kariangodu river at Palayi Valavu in Kasargod District. Construction of SWE Regulator cum Bridge Length of Regulator : 227 m,Foundation : Pile foundation, Abutment : CC retaining wall,Type of bridge : RCC Beam and Slab,No of Span : 17Nos Superintending Engineer , Irrigation North Circle, Cauvery House, West Hill , Kozhikode 42,66,53,053
7 Execution Of Civil Works Of Chinnar Small Hydro Electric Project (24MW/ 76.45 Mu) Excavation, Rubble masonry, reinforcement cement concrete work, drilling, road works
Intake and Tunnel works – excavation , hard rock , driving power tunnel, cement concrete works , structural steel woks (hydro mechanical works ) diversion of water etc.
The Chief Engineer
(Civil-Investigation & Construction Central),KSEB Ltd.
Vydyuthi Bhavanam, Pattom,
Thiruvananthapuram – 695 004,
Kerala, India.
80,60,69,387.4
8   Doubling of track between Kuruppanthara and Chingavanam – Earth work in forming bank / cutting, extension of minor bridges, gabion walls, incidental permanant way works, protective works etc from Ch: 59000 to 67000 between  hingavanam and Kottayam stations Earth work in cutting and filling for forming embankments, construction of minor bridges randoma raubble masonry side drains catch water drains RCC retaiing walls and gabion walls ,Anti erosion control measures like coir matting pitching flooring etc;   The Chief Engineer Construction , Office of the Chief Administrative Officer (Construction), Ernakulam   24,72,73,499.8
9  Civil & Structural Works For KOCHI-SALEM LPG PIPELINE PROJECT OF M/s KSPPL  The Civil and Structural work for “Civil and Structural works for SV Stations”For  KOCHI-SALEM LPG PIPELINE PROJECT  OF M/s KSPPL  The Chief Executive Officer , KSPPL , Malayil Megesty Building , Room No 174-G Second floor Refinery Road Tripunithura   38,00,89,665

☷ Latest Updates

News

Recently we have completed the work of "Underpass and Warehouse for Propylene Derivative Petrochemic...

Hydro Electric Project

We had completed the “Execution of Perunthenaruvi Small Hydro Electric Project (6MW) completed on...